Home›Resources›Bathroom cost

What does a bathroom remodel cost in Bellevue?

2026 price ranges from a cosmetic refresh to a primary bath with moved plumbing — what each includes, how long it takes and what moves the number.

The short answer

Most Bellevue bathrooms land between $13,500 and $54,000

In 2026, a cosmetic bathroom refresh on the Eastside starts at about $7,500. A full hall or guest bathroom usually runs $13,500–$27,000, a primary bathroom $27,000–$54,000, and a luxury remodel that moves the shower, toilet or drain starts around $54,000. A typical hall bathroom takes 2–4 weeks on site once the design is final and materials are in hand.

For a wider view: the 2025 Cost vs. Value report puts a midrange bathroom remodel in the Seattle market at $36,146, against a national average of $26,138. That benchmark is a full update of a 5×7 ft bathroom — new tub with tile surround, toilet, vanity and lighting.

Price ranges

Bathroom remodel options at a glance

ScopeWhat's includedTypical priceOn site
Cosmetic refreshNew vanity, toilet, fixtures, lighting, fan, paint and flooring; plumbing stays where it is$7,500–$13,5001–2 weeks
Hall / guest bathroomGut to the studs, new waterproofed tile tub or shower, vanity and top, flooring, lighting$13,500–$27,0002–4 weeks
Primary bathroomLarger room, walk-in tile shower, double vanity, heated floor, custom glass$27,000–$54,0004–6 weeks
Luxury / layout changeMoving the shower, toilet or drain, curbless shower, freestanding tub, premium stone and fixtures$54,000+6–10 weeks

Ranges reflect typical 2026 Eastside projects with labor and standard materials. Your price is set by a written, itemized estimate after a free walkthrough. Permit fees, special-order materials and hidden damage are priced separately — always in writing.

What moves the number

Six things that drive bathroom cost

Keeping the layout — or not

A toilet or sink replaced in the same spot is the cheapest path. Moving a shower, toilet or drain means opening floors and walls, rerouting plumbing and more permit work.

Shower and tub

A standard tub with a tile surround costs far less than a curbless walk-in shower with frameless glass, niches and a bench. Waterproofing is not where to save — every tiled wet area we build sits on a proper waterproofing system.

Tile

Often the biggest finish cost: the material plus the labor for large-format, patterned or floor-to-ceiling work. Tile is our owner's own trade, and it is where we put the most care.

Vanity and top

Stock, semi-custom and fully custom vanities with quartz or stone tops sit at very different price points.

Heat, light and air

Radiant floor heat, layered lighting and a properly sized exhaust fan vented outside — the residential code calls for at least 50 cfm in a bathroom — add comfort and protect the room from moisture.

What is behind the walls

Older Eastside homes sometimes hide water damage, tired wiring or undersized drains. If we find something, we photograph it, explain it and price it in writing before any extra work starts.

An alternative to tile

A seamless shower instead of grout lines

If you want a shower with almost no grout to clean, ask about our porcelain-slab showers — large panels instead of hundreds of tiles. They are made and installed by our own SLAB SHOWER line.

Permits

Does a bathroom remodel need a permit in Bellevue?

Often, yes. The City of Bellevue requires a permit for showers and bathtubs, and for any new or moved fixture that changes water lines, drains or vents. Replacing a toilet or sink with a similar one in the same spot does not need one. A remodel that does not touch structure usually gets a permit the same day without plan review — inspections are still required. We pull the permit and meet the inspectors for you. Other cities differ; see what needs a permit on the Eastside.

Budget

How to keep a bathroom remodel on budget

  • Keep the drain where it is. Whether plumbing moves is the single biggest swing in bathroom cost.
  • Spend on what you touch every day — the shower valve, faucet and vanity. Save on accent tile.
  • Pick finishes before demolition. Tile and fixtures chosen early keep the crew working and the schedule tight.
  • One feature wall of premium tile instead of premium tile on every wall.
  • Keep a small contingency for what is behind older walls.

How we price your bathroom

  1. Free walkthrough. We visit, measure and talk through what you want — no cost, no obligation.
  2. Written, itemized estimate. Selections you have not made yet are shown as clear allowances.
  3. Clear contract. A deposit, progress payments tied to milestones, and the final payment only when the punch list is done.
  4. 5-year workmanship warranty. Manufacturer warranties are handed over at closeout.
Questions

Bathroom cost questions

Will the price grow once the work starts?
Not because we left things out. Before you sign, you get a detailed written scope that lists what will be done, room by room, with the materials and allowances — so you know exactly what you are paying for. We do not lowball an estimate to win the job and then add a list of extras once the walls are open. The only changes are things nobody could see in advance, such as damage behind a wall; we photograph them, explain them and price them in writing before any extra work starts. The decision is always yours.
How do you protect our home while we live in it?
We treat your home as if we lived there. Before work starts, we put up dust barriers and seal off the work area, cover floors along the path to it and protect furniture and finishes nearby. The crew keeps the site tidy and cleans up at the end of every day, and your project manager walks you through what to expect each week so nothing comes as a surprise.
How much does a small bathroom remodel cost in Bellevue?
A cosmetic refresh of a small bathroom starts at about $7,500. A full remodel of a hall or guest bathroom typically costs $13,500–$27,000. Primary bathrooms with custom tile or moved plumbing cost more.
How long does a bathroom remodel take?
About 1–2 weeks for a refresh, 2–4 weeks for a full hall bathroom and 4–6 weeks for a primary bathroom of on-site work, once the design is final and materials are on hand.
Can I use the bathroom during the remodel?
Not the one being remodeled. If you have a second bathroom, most families stay in the home without much disruption.
Do you handle permits?
Yes. We pull the permits, schedule the inspections and make sure the work meets code.
Is the price the same in Kirkland, Redmond or Sammamish?
Very close. The ranges on this page apply across the Eastside; permit fees and a few city rules differ, and we include them in your written estimate.
Can I send photos before the walkthrough?
Yes. Text photos of your bathroom to (425) 981-5887 and we will take a first look.
Call(425) 981-5887Text photos(425) 981-5887Free estimateNo obligation