The house we built
Our own completed build, photographed as it was handed over. Two more new homes are finishing now and will be added here.
See all nine projectsA new home is a two-year relationship, not a transaction
Most people who call us about a custom home have already learned the hard part: the building is the easy half. The hard half is the eighteen months of decisions, drawings, revisions, inspections and invoices that come before anyone hangs a door. That is the part we run for you.
We work as your single point of contact from the day you own the lot. We coordinate with your architect or bring one in, take the drawings through the city, run the site, schedule and supervise every trade, and hand you a home with a punch list already closed out. You do not chase a designer, a permit expediter and a builder who each blame the other two.
What we build
- Infill and tear-down rebuilds on established Eastside lots, where setbacks, tree retention and neighbor impact drive the whole design.
- View and slope properties that need geotechnical work, retaining walls and engineered foundations before anything goes vertical.
- Family homes on flat lots where the win is a smart floor plan, real storage and finishes that still look right in fifteen years.
- Homes with an attached or detached ADU planned in from day one, so the rental unit is not an awkward retrofit later.
Site work is where budgets are won or lost
In this part of Washington, the ground decides a lot. Wet winters, clay soils, slopes and tree-retention rules mean that drainage, grading and foundation engineering deserve real money and real attention up front. We would rather spend an extra week on the geotech report and the storm-water plan than discover the problem after the slab is poured. Every home we build gets a moisture strategy that assumes eight months of rain a year, because that is what it gets.
Energy code, and why it matters to your bill
New homes in Washington are built to one of the strictest energy codes in the country. That means a tight envelope, careful air sealing, high-performance windows, balanced ventilation and, increasingly, heat pumps instead of gas furnaces. We treat those requirements as a design input from the first meeting rather than a box to check at inspection — a house that is detailed properly is quieter, drier and cheaper to run for as long as you own it.
How the money is structured
You get a written scope and an itemized estimate before we start, an allowance schedule for the selections you have not made yet, and a draw schedule tied to real milestones. Change orders are written, priced and signed before the work happens — never discovered on the final invoice. If you are financing through a construction loan, we work directly with your lender's inspector on each draw.
Custom home at a glance
- Typical timeline: 12–20 months from design start to move-in
- We coordinate architect, structural, geotech and civil
- City permits and inspections handled by us
- Draw schedule tied to milestones, not calendar dates
- Written change orders — signed before work begins
- One project manager, reachable by phone
What a custom home with us includes
Feasibility and lot review
Zoning, setbacks, critical areas, tree retention, utility connections and an honest read on what your lot will actually allow.
Design coordination
We work with your architect and designer — or bring ours in — and keep the drawings buildable and on budget.
Permitting
Submittal, plan-review comments, revisions and resubmittals with the city. We chase the reviewer so you don't.
Site and foundation
Clearing, erosion control, excavation, drainage, footings and engineered foundations.
Structure and envelope
Framing, roofing, windows, weather barrier, insulation and air sealing to the state energy code.
Systems
Electrical, plumbing, HVAC and low-voltage, coordinated so nothing gets cut through later.
Interiors and finishes
Cabinetry, tile, millwork, flooring, paint, fixtures — with an allowance schedule you can actually track.
Closeout
Final inspections, punch list, warranty documents, and a walkthrough where we show you how the house works.
Frequently asked questions
How long does a custom home take on the Eastside?
Do I need to have an architect before I call you?
Can you build on a steep or difficult lot?
Do you handle permits, or do I?
Can a custom home include an ADU?
Send us photos first. No visit, no obligation.
Not everyone is ready to have a contractor in the house. Text photos of the room to the number below and we will tell you what scope it looks like and what that kind of job normally involves — before anyone comes out.
Related services
Ready when you are
Call, text or send the form. We come out, listen, measure, and send you an itemized estimate in writing — no charge and no obligation.
Get a Free EstimateGet a free estimate
Tell us about your project — we'll come out, listen, and give you an honest number.
Call or text(425) 866-3940Email: office@nwhomesremodel.com
Hours: Mon–Fri 8:00 AM – 6:00 PM · Sat by appointment
Based in Kirkland, WA — serving the Eastside and Greater Seattle