HomeServicesKitchen Remodeling

Kitchen remodeling from a refresh to taking the wall out

Custom cabinetry, real stone, proper lighting and a layout that works when four people are in the room at once. Serving Kirkland, Bellevue, Redmond, Sammamish and greater Seattle.

Proof, not promises

Kitchens we have finished

Our own completed projects, photographed as they were handed over. Open one to see the whole set — including what the rooms looked like before we started.

See all nine projects
Full-Service, Start to FinishWe Handle the PermitsSmall Jobs WelcomeServing the Eastside & Seattle

The layout matters more than the finishes

People come to us with a photo of a kitchen they love. Almost always, what they actually love about it is the layout — the island you can walk around, the sink under a window, the fridge that is not in the way of the oven door. The stone and the cabinet color are the easy part. We start with how you cook and where people stand, then choose materials.

In most Eastside houses from the seventies through the nineties, the kitchen is a closed box with a soffit, one small window and a doorway into the dining room. The single highest-value move is usually opening that wall — which is a structural job, not a demolition job, and it is where a licensed contractor earns the fee.

Taking out the wall, properly

If the wall is load-bearing, removing it means a properly sized beam, posts that land on real support, and a load path continuing down to the foundation — sometimes including a new footing in the crawl space. That requires engineering, a permit and inspection. We have seen plenty of kitchens where a previous crew simply cut the studs and hoped. It shows up years later as a sagging ceiling line and a very expensive repair.

Electrical and plumbing, brought up to date

A modern kitchen needs far more circuits than a 1985 one: dedicated circuits for the range, oven, dishwasher, disposal, microwave and refrigerator, GFCI protection at the counters, and enough capacity in the panel to carry it. If you are moving to induction, that is another dedicated 240-volt run. We check the panel before you fall in love with an appliance package, not after.

Cabinetry, counters and the things that wear out

  • Cabinets — semi-custom or fully custom, plywood boxes, soft-close hardware, drawers instead of low cupboards, and the interior fittings that make the difference day to day.
  • Counters — quartz for durability and consistency, natural stone where you want the character and accept the maintenance.
  • Lighting — layered: task lighting over the work surfaces, ambient overhead, and something with character over the island. Most failed kitchens are simply under-lit.
  • Ventilation — a hood that actually moves air outside, ducted properly and sized to the range. Recirculating hoods are a compromise we will talk you out of when we can.
  • Flooring — engineered wood, tile or LVP, chosen for how the room gets used and whether there is a dog.

Lead times run the schedule

Cabinets are typically six to twelve weeks from the day the order is placed, and stone cannot be templated until the cabinets are set. This is why we give you a selections deadline early: the fastest way to add a month to a kitchen is to keep changing the door style in week three.

Kitchen remodel at a glance

  • On site: typically 6–10 weeks
  • Cabinet lead time: 6–12 weeks from order
  • Stone templated after cabinets are set
  • Permit required if walls, plumbing or wiring move
  • Temporary kitchen setup planned with you
  • One point of contact for the whole job
Call or text(425) 866-3940 Get a Free Estimate
Scope

What's included in a kitchen remodel

01

Layout and design

Measured drawings, two or three real options, and elevations so you can see it before it exists.

02

Structural work

Engineering, beams and posts where a wall comes out — permitted and inspected.

03

Electrical

New circuits, panel capacity check, GFCI protection, under-cabinet and layered lighting.

04

Plumbing

Sink and dishwasher relocation, new supply and drain lines, pot filler if you want one.

05

Cabinetry and millwork

Ordering, receiving, inspecting and installing — plus the trim and panels that make it look built-in.

06

Counters and tile

Templating, fabrication, install, backsplash and grout detailing.

07

Appliances

Coordinated with the cabinet order so the gaps are right and the doors clear each other.

08

Finish and cleanup

Paint, hardware, adjustment of every door and drawer, and a genuinely clean handover.

Good to Know

Frequently asked questions

How long will I be without a kitchen?
Six to ten weeks on site for a typical full remodel, longer if walls move or cabinets are fully custom. We help you set up a temporary kitchen — usually the fridge, microwave and a kettle in the dining room — and we tell you the realistic date, not the optimistic one.
Do I need a permit for a kitchen remodel?
Not if cabinets, counters, flooring and appliances stay in the same places. Yes if you remove or move a wall, relocate plumbing, or add electrical circuits — which most real kitchen remodels do. We pull it and schedule the inspections.
Can you remove the wall between my kitchen and living room?
Usually. If it is load-bearing we bring in a structural engineer, size a beam, and carry the load properly down to the foundation. That is a permitted, inspected job and it is worth doing correctly the first time.
Quartz or natural stone?
Quartz for most families: it does not stain, does not need sealing, and looks the same in five years. Natural stone — marble in particular — is beautiful and will patina, etch and mark. Neither is wrong; we just want you choosing with your eyes open.
Can I supply my own appliances or cabinets?
Yes. We will coordinate around them, but we will also be clear about what we can and cannot warranty, and about what happens to the schedule if a client-supplied item arrives late or damaged.
Before you commit

Send us photos first. No visit, no obligation.

Not everyone is ready to have a contractor in the house. Text photos of the room to the number below and we will tell you what scope it looks like and what that kind of job normally involves — before anyone comes out.

The walkthrough is freeWe come out, look, listen and measure. There is no charge and no obligation at that stage.
You get it in writingA written quote, line by line, after the walkthrough — so you can read it and compare it, not just hear a number.
Permits and inspections are oursWe pull them and schedule them. You are not the one calling the city.

Ready when you are

Call, text or send the form. We come out, listen, measure, and send you an itemized estimate in writing — no charge and no obligation.

Get a Free Estimate
Let's Talk

Get a free estimate

Tell us about your project — we'll come out, listen, and give you an honest number.

Call or text(425) 866-3940

Email: office@nwhomesremodel.com

Hours: Mon–Fri 8:00 AM – 6:00 PM · Sat by appointment

Based in Kirkland, WA — serving the Eastside and Greater Seattle

Leave a phone or an email — whichever you prefer. One is enough.

Have photos? Email them to office@nwhomesremodel.com — the form here does not take attachments.

Call(425) 866-3940Send photosBy emailFree estimateNo obligation