Kitchens we have finished
Our own completed projects, photographed as they were handed over. Open one to see the whole set — including what the rooms looked like before we started.
The layout matters more than the finishes
People come to us with a photo of a kitchen they love. Almost always, what they actually love about it is the layout — the island you can walk around, the sink under a window, the fridge that is not in the way of the oven door. The stone and the cabinet color are the easy part. We start with how you cook and where people stand, then choose materials.
In most Eastside houses from the seventies through the nineties, the kitchen is a closed box with a soffit, one small window and a doorway into the dining room. The single highest-value move is usually opening that wall — which is a structural job, not a demolition job, and it is where a licensed contractor earns the fee.
Taking out the wall, properly
If the wall is load-bearing, removing it means a properly sized beam, posts that land on real support, and a load path continuing down to the foundation — sometimes including a new footing in the crawl space. That requires engineering, a permit and inspection. We have seen plenty of kitchens where a previous crew simply cut the studs and hoped. It shows up years later as a sagging ceiling line and a very expensive repair.
Electrical and plumbing, brought up to date
A modern kitchen needs far more circuits than a 1985 one: dedicated circuits for the range, oven, dishwasher, disposal, microwave and refrigerator, GFCI protection at the counters, and enough capacity in the panel to carry it. If you are moving to induction, that is another dedicated 240-volt run. We check the panel before you fall in love with an appliance package, not after.
Cabinetry, counters and the things that wear out
- Cabinets — semi-custom or fully custom, plywood boxes, soft-close hardware, drawers instead of low cupboards, and the interior fittings that make the difference day to day.
- Counters — quartz for durability and consistency, natural stone where you want the character and accept the maintenance.
- Lighting — layered: task lighting over the work surfaces, ambient overhead, and something with character over the island. Most failed kitchens are simply under-lit.
- Ventilation — a hood that actually moves air outside, ducted properly and sized to the range. Recirculating hoods are a compromise we will talk you out of when we can.
- Flooring — engineered wood, tile or LVP, chosen for how the room gets used and whether there is a dog.
Lead times run the schedule
Cabinets are typically six to twelve weeks from the day the order is placed, and stone cannot be templated until the cabinets are set. This is why we give you a selections deadline early: the fastest way to add a month to a kitchen is to keep changing the door style in week three.
Kitchen remodel at a glance
- On site: typically 6–10 weeks
- Cabinet lead time: 6–12 weeks from order
- Stone templated after cabinets are set
- Permit required if walls, plumbing or wiring move
- Temporary kitchen setup planned with you
- One point of contact for the whole job
What's included in a kitchen remodel
Layout and design
Measured drawings, two or three real options, and elevations so you can see it before it exists.
Structural work
Engineering, beams and posts where a wall comes out — permitted and inspected.
Electrical
New circuits, panel capacity check, GFCI protection, under-cabinet and layered lighting.
Plumbing
Sink and dishwasher relocation, new supply and drain lines, pot filler if you want one.
Cabinetry and millwork
Ordering, receiving, inspecting and installing — plus the trim and panels that make it look built-in.
Counters and tile
Templating, fabrication, install, backsplash and grout detailing.
Appliances
Coordinated with the cabinet order so the gaps are right and the doors clear each other.
Finish and cleanup
Paint, hardware, adjustment of every door and drawer, and a genuinely clean handover.
Frequently asked questions
How long will I be without a kitchen?
Do I need a permit for a kitchen remodel?
Can you remove the wall between my kitchen and living room?
Quartz or natural stone?
Can I supply my own appliances or cabinets?
Send us photos first. No visit, no obligation.
Not everyone is ready to have a contractor in the house. Text photos of the room to the number below and we will tell you what scope it looks like and what that kind of job normally involves — before anyone comes out.
Related services
Ready when you are
Call, text or send the form. We come out, listen, measure, and send you an itemized estimate in writing — no charge and no obligation.
Get a Free EstimateGet a free estimate
Tell us about your project — we'll come out, listen, and give you an honest number.
Call or text(425) 866-3940Email: office@nwhomesremodel.com
Hours: Mon–Fri 8:00 AM – 6:00 PM · Sat by appointment
Based in Kirkland, WA — serving the Eastside and Greater Seattle