HomeServicesBathroom Remodeling

Bathroom remodeling waterproofed properly, finished beautifully

Walk-in showers, soaking tubs, heated floors, custom tile and real ventilation. From powder rooms to primary suites across the Eastside and greater Seattle.

Proof, not promises

Bathrooms we have finished

Our own completed projects, photographed as they were handed over. Open one to see the whole set — including what the rooms looked like before we started.

See all nine projects
Full-Service, Start to FinishWe Handle the PermitsSmall Jobs WelcomeServing the Eastside & Seattle

Everything you can see depends on something you can't

A bathroom is the smallest room in the house and the most expensive per square foot, because it is the only room that is deliberately filled with water several times a day. What separates a bathroom that lasts twenty years from one that fails in five is entirely hidden: the slope of the pan, the waterproofing membrane, the way the curb is detailed, whether the niche was flashed, whether the fan actually vents outdoors.

We build showers with a bonded waterproofing system rather than relying on the tile and grout to keep water out — because grout is not waterproof and never was. Every penetration gets sealed. Every niche and bench gets sloped. It costs a little more and it is the reason we can warranty the work.

Ventilation is not optional here

Western Washington gives you eight months of damp air a year. A bathroom fan that is undersized, ducted into the attic instead of outside, or wired to the same switch as the light and therefore never run long enough, is how you get black mold on the ceiling and rot in the framing. We size the fan to the room, duct it outdoors with insulated rigid duct, and put it on a humidity sensor or a timer so it runs after you leave.

What we build

  • Curbless walk-in showers with linear drains — the best-looking option and the most accessible one, but it requires framing to be dropped and done right.
  • Primary suites with a freestanding tub, a double vanity and a separate water closet.
  • Guest and hall bathrooms where the goal is durable, timeless and finished quickly.
  • Powder rooms, where you can afford to be bold because the square footage is tiny.
  • Accessible bathrooms — zero-threshold entries, wider doors, blocking in the walls for grab bars now or later, and lighting that suits older eyes.
  • Heated floors, which in this climate is the single upgrade clients thank us for most often.

Old houses, old plumbing

When we open a bathroom in a house built before the mid-nineties, galvanized supply lines, cast-iron drains at the end of their life and a vent stack that was never quite right are all normal finds. We would rather replace a failing drain while the floor is already open than close it up and have you call us in three years.

Bathroom remodel at a glance

  • On site: typically 3–6 weeks
  • Bonded waterproofing system on all showers
  • Fan ducted outdoors, sized to the room
  • Tile templated and laid out before it's set
  • Heated floor option on almost any layout
  • Written workmanship warranty
Call or text(425) 866-3940 Get a Free Estimate
Scope

What's included in a bathroom remodel

01

Design and layout

Fixture placement, tile layout drawings and a selections list with lead times attached.

02

Demolition

Contained, dust-controlled, with the surrounding floors protected.

03

Framing changes

Dropping the floor for a curbless shower, moving a wall, adding blocking for grab bars and floating vanities.

04

Plumbing

New supply and drain, valve and fixture rough-in, replacement of anything failing that we uncover.

05

Electrical and heat

GFCI protection, vanity and shower lighting, exhaust fan, and electric floor heat with its own thermostat.

06

Waterproofing

Bonded membrane on the pan, walls, curb, niche and bench — tested before tile.

07

Tile and stone

Laid out to the room so cuts land where they should, with the grout and sealant detailed properly.

08

Fixtures and finish

Vanity, mirrors, glass, hardware, paint and a final clean.

Scope and time

Three levels. Pick the one that matches your bathroom.

Every timeline below starts the day we open the wall, not the day you call.

Level 1 · Refresh
from 1 week

Nothing moves. New tile, tub or shower, vanity, toilet, fixtures and lights in the boxes that are already there. The plumbing stays where it is.

Usually no permit — which is the only reason one week is possible.

Level 2 · Full rebuild
from 3 weeks

Down to the studs. New waterproofing that gets tested before any tile goes on, plumbing and electrical moved, niche, glass, heated floor if you want one.

Permit and two inspections: rough-in before the walls close, then final.

Level 3 · Primary suite
from 4 weeks

Walls move and the footprint changes. Freestanding tub and a walk-in shower, double vanity, custom tile work.

Permit, engineering where it is needed, inspections — we pull and schedule all of it.

Five stages you sign off on — so you never have to be the inspector

A written quote, line by line, within two business days of the walkthrough. Then this:

1
DemolitionWe photograph whatever we find behind the old walls and show you before anything is covered.
2
Plumbing rough-inPressure tested. You get the photo and the result before the walls close — not a promise that it was done.
3
WaterproofingInstalled to the manufacturer’s instructions, flood tested, photographed with the date. Tile does not start until it passes.
4
Tile layoutLaid out dry and approved by you, so the cuts land where they should. Then it gets set.
5
Punch listWe walk the room together, write the list, finish it, and clean the room properly. Final payment comes after that, not before.

One foreman runs all five, in English, and you have his number from day one. Hidden damage is priced separately and approved by you in writing before we keep going — it never shows up in the final invoice as a surprise.

Why we don’t do a bathroom in three days

A one-day bathroom is a plastic liner glued over your old tub. A three-day bathroom is a shower where nothing had time to cure. We take the room to the studs, waterproof it, let it cure, test it, and only then set tile. On a small bathroom that is a week — and it is a week only because nothing in it needed to move.

If someone quotes you a week on a full rebuild, ask one question: does my job need a permit? If it does, there are two inspections — rough-in before the walls close, and final. Nobody closes a wall in the same week they opened it.

Good to Know

Frequently asked questions

How long does a bathroom remodel take?
Three to six weeks on site for most bathrooms once materials are in hand. The waterproofing and tile stages cannot be rushed — membranes and mortar need their cure time, and skipping it is how showers fail.
Is a curbless shower a lot more expensive?
Somewhat, because the floor framing usually has to be dropped to keep the drain sloped correctly. On a slab or over a crawl space it is very achievable. It is worth it if you plan to stay in the house long-term.
Do you use a waterproofing membrane, or just cement board?
A bonded membrane system over the substrate. Cement board alone is a backer, not a waterproofing layer, and grout is porous by nature. The membrane is the part that actually keeps water in the shower.
Can you add heated floors to an existing bathroom?
Yes — the mats or cables go under the new tile with a dedicated thermostat. It has to be planned before the floor goes down and it needs its own circuit, which we run during the electrical stage.
Do I need a permit for a bathroom remodel?
If you are replacing fixtures in the same locations, often not. If plumbing moves, electrical is added, or framing changes — yes, and that covers nearly every full remodel. We handle it.
Before you commit

Send us photos first. No visit, no obligation.

Not everyone is ready to have a contractor in the house. Text photos of the room to the number below and we will tell you what scope it looks like and what that kind of job normally involves — before anyone comes out.

The walkthrough is freeWe come out, look, listen and measure. There is no charge and no obligation at that stage.
You get it in writingA written quote, line by line, after the walkthrough — so you can read it and compare it, not just hear a number.
Permits and inspections are oursWe pull them and schedule them. You are not the one calling the city.

Ready when you are

Call, text or send the form. We come out, listen, measure, and send you an itemized estimate in writing — no charge and no obligation.

Get a Free Estimate
Let's Talk

Get a free estimate

Tell us about your project — we'll come out, listen, and give you an honest number.

Call or text(425) 866-3940

Email: office@nwhomesremodel.com

Hours: Mon–Fri 8:00 AM – 6:00 PM · Sat by appointment

Based in Kirkland, WA — serving the Eastside and Greater Seattle

Leave a phone or an email — whichever you prefer. One is enough.

Have photos? Email them to office@nwhomesremodel.com — the form here does not take attachments.

Call(425) 866-3940Send photosBy emailFree estimateNo obligation