Additions and ADUs we have built
Our own completed projects, photographed as they were handed over. Open one to see the whole set — including what the rooms looked like before we started.
See all nine projectsStart with what the lot allows
Every addition and ADU project begins the same way: we look up your zoning, your lot coverage, your setbacks, your height limit, tree retention and any critical-area overlays, and we tell you what is genuinely buildable. That first conversation saves people months. There is no point drawing a beautiful 900-square-foot cottage for a lot that will only carry 600.
Washington's ADU legislation has pushed cities across the state to allow accessory dwelling units far more broadly than they used to — but the specifics still differ from Kirkland to Bellevue to unincorporated King County: maximum size, maximum height, setbacks, parking, entrance location and design standards. We check your jurisdiction, not a general rule of thumb.
Room and second-story additions
Adding to a house is harder than building new, because everything has to marry into what is already there — the roof line, the floor heights, the siding, the foundation and the existing structure that now has to carry more. A good addition should be invisible from the street: same pitch, same materials, same window proportions. When you can tell where the old house ends, someone cut a corner.
Detached ADUs (DADUs)
A backyard cottage is the closest thing to a small custom home: its own foundation, its own utility connections, its own kitchen and bathroom, its own energy-code compliance. Done well it becomes long-term rental income, a place for parents, a place for adult children, or the flexible space that lets you stay in a house you have outgrown. Done cheaply it becomes a permit problem and a maintenance headache.
Garage and basement conversions
- Garage conversion (AADU) — often the fastest route to a legal second unit, but it needs insulation, a real floor assembly, egress, ventilation and usually a heat source.
- Basement conversion — ceiling height, egress windows, moisture management and a separate entrance are the four things that decide whether it is possible.
- Bonus room over the garage — check the existing framing first; garage roofs were rarely designed to carry a floor.
Utilities are the hidden cost
Sewer capacity, side-sewer routing, water meter size, and whether your electrical service can carry a second dwelling are the items that quietly move an ADU budget. We get those answers during feasibility, before you commit to a design.
Addition and ADU at a glance
- Feasibility review before any design work
- Detached ADU: typically 9–14 months start to finish
- Room addition: typically 4–8 months
- Zoning, setbacks and tree rules checked per city
- Utility capacity confirmed early, not late
- Full permitting handled by us
How an addition or ADU runs
Feasibility
Zoning, lot coverage, setbacks, height, critical areas, trees and utilities — a written read on what is buildable.
Concept and budget
Two or three layouts against a real budget, so you choose before the drawings get expensive.
Design and engineering
Construction drawings, structural engineering, and energy-code compliance documentation.
Permitting
Submittal, review comments and resubmittals with the city — plus any separate utility or side-sewer permits.
Site and foundation
Excavation, drainage, footings and slab or crawl space for a detached unit.
Build
Framing, roof, envelope, systems, insulation and finishes — inspected at each stage.
Utilities and connections
Water, sewer, power and, where relevant, a separate meter or address assignment.
Closeout
Final inspection, certificate of occupancy where required, and handover documents.
Frequently asked questions
Can I build an ADU on my lot?
How long does a detached ADU take?
Will an addition match the existing house?
Can I rent the ADU out?
Is converting my garage cheaper than building a detached unit?
Send us photos first. No visit, no obligation.
Not everyone is ready to have a contractor in the house. Text photos of the room to the number below and we will tell you what scope it looks like and what that kind of job normally involves — before anyone comes out.
Related services
Ready when you are
Call, text or send the form. We come out, listen, measure, and send you an itemized estimate in writing — no charge and no obligation.
Get a Free EstimateGet a free estimate
Tell us about your project — we'll come out, listen, and give you an honest number.