HomeServicesAdditions & ADUs

Additions and ADUs more house, or a second one in the back yard

Room additions, second stories, garage and basement conversions, and detached accessory dwelling units. We check what your lot and your city actually allow before you fall in love with a plan.

Proof, not promises

Additions and ADUs we have built

Our own completed projects, photographed as they were handed over. Open one to see the whole set — including what the rooms looked like before we started.

See all nine projects
Full-Service, Start to FinishWe Handle the PermitsSmall Jobs WelcomeServing the Eastside & Seattle

Start with what the lot allows

Every addition and ADU project begins the same way: we look up your zoning, your lot coverage, your setbacks, your height limit, tree retention and any critical-area overlays, and we tell you what is genuinely buildable. That first conversation saves people months. There is no point drawing a beautiful 900-square-foot cottage for a lot that will only carry 600.

Washington's ADU legislation has pushed cities across the state to allow accessory dwelling units far more broadly than they used to — but the specifics still differ from Kirkland to Bellevue to unincorporated King County: maximum size, maximum height, setbacks, parking, entrance location and design standards. We check your jurisdiction, not a general rule of thumb.

Room and second-story additions

Adding to a house is harder than building new, because everything has to marry into what is already there — the roof line, the floor heights, the siding, the foundation and the existing structure that now has to carry more. A good addition should be invisible from the street: same pitch, same materials, same window proportions. When you can tell where the old house ends, someone cut a corner.

Detached ADUs (DADUs)

A backyard cottage is the closest thing to a small custom home: its own foundation, its own utility connections, its own kitchen and bathroom, its own energy-code compliance. Done well it becomes long-term rental income, a place for parents, a place for adult children, or the flexible space that lets you stay in a house you have outgrown. Done cheaply it becomes a permit problem and a maintenance headache.

Garage and basement conversions

  • Garage conversion (AADU) — often the fastest route to a legal second unit, but it needs insulation, a real floor assembly, egress, ventilation and usually a heat source.
  • Basement conversion — ceiling height, egress windows, moisture management and a separate entrance are the four things that decide whether it is possible.
  • Bonus room over the garage — check the existing framing first; garage roofs were rarely designed to carry a floor.

Utilities are the hidden cost

Sewer capacity, side-sewer routing, water meter size, and whether your electrical service can carry a second dwelling are the items that quietly move an ADU budget. We get those answers during feasibility, before you commit to a design.

Addition and ADU at a glance

  • Feasibility review before any design work
  • Detached ADU: typically 9–14 months start to finish
  • Room addition: typically 4–8 months
  • Zoning, setbacks and tree rules checked per city
  • Utility capacity confirmed early, not late
  • Full permitting handled by us
Call or text(425) 866-3940 Get a Free Estimate
Scope

How an addition or ADU runs

01

Feasibility

Zoning, lot coverage, setbacks, height, critical areas, trees and utilities — a written read on what is buildable.

02

Concept and budget

Two or three layouts against a real budget, so you choose before the drawings get expensive.

03

Design and engineering

Construction drawings, structural engineering, and energy-code compliance documentation.

04

Permitting

Submittal, review comments and resubmittals with the city — plus any separate utility or side-sewer permits.

05

Site and foundation

Excavation, drainage, footings and slab or crawl space for a detached unit.

06

Build

Framing, roof, envelope, systems, insulation and finishes — inspected at each stage.

07

Utilities and connections

Water, sewer, power and, where relevant, a separate meter or address assignment.

08

Closeout

Final inspection, certificate of occupancy where required, and handover documents.

Good to Know

Frequently asked questions

Can I build an ADU on my lot?
Most likely, but the details decide it. Washington law now requires most cities to allow accessory dwelling units on residential lots, and many jurisdictions permit both an attached and a detached unit. Size limits, height, setbacks, parking and design standards still vary by city, and critical areas can override everything. We check your specific address during feasibility.
How long does a detached ADU take?
Roughly nine to fourteen months from the start of design to occupancy, with permitting being the widest variable. Construction itself is usually six to nine months.
Will an addition match the existing house?
That is the goal, and it is a design decision made early — roof pitch, siding profile, window proportion, trim details and color. Where an exact material match no longer exists, we look for the closest current product and plan the transition where it reads naturally.
Can I rent the ADU out?
In most Eastside jurisdictions, yes — that is the point of the legislation. Some cities have rules about short-term rentals specifically, and a few still have owner-occupancy provisions. We will tell you what applies to your address; for anything binding, confirm with the city or your attorney.
Is converting my garage cheaper than building a detached unit?
Usually, because the shell already exists. But the foundation, floor assembly, insulation, egress and ventilation all have to be brought to residential standard, and you lose the garage. We price both when it is a real choice.
Before you commit

Send us photos first. No visit, no obligation.

Not everyone is ready to have a contractor in the house. Text photos of the room to the number below and we will tell you what scope it looks like and what that kind of job normally involves — before anyone comes out.

The walkthrough is freeWe come out, look, listen and measure. There is no charge and no obligation at that stage.
You get it in writingA written quote, line by line, after the walkthrough — so you can read it and compare it, not just hear a number.
Permits and inspections are oursWe pull them and schedule them. You are not the one calling the city.

Ready when you are

Call, text or send the form. We come out, listen, measure, and send you an itemized estimate in writing — no charge and no obligation.

Get a Free Estimate
Let's Talk

Get a free estimate

Tell us about your project — we'll come out, listen, and give you an honest number.

Call or text(425) 866-3940

Email: office@nwhomesremodel.com

Hours: Mon–Fri 8:00 AM – 6:00 PM · Sat by appointment

Based in Kirkland, WA — serving the Eastside and Greater Seattle

Leave a phone or an email — whichever you prefer. One is enough.

Have photos? Email them to office@nwhomesremodel.com — the form here does not take attachments.

Call(425) 866-3940Send photosBy emailFree estimateNo obligation